Category
Automatic Plastic Poly Biodegradable PE HDPE LDPE Drawstring Garbage Bag Making Machine Rolling Draw Tape Garbage Bag on Roll Machine Film Blowing Machine
Overview Product Description Silstar's automatic drawstring bag making machine are using the newly designed and stable r
Overview
Main products:
SILSTAR Workshop Pictures:
Basic Info.
Model NO. | GBBCR-1200 |
Layer | Double |
Machine Type | Bag Making Machine |
Computerized | Computerized |
Type | Plastic Bag Making Machine |
Machine Inverter Brand | Made in Taiwan |
Machine Brand | Silstar |
Machine Control | Computer Box |
Servo Motor | Made in Taiwan |
Temperature Controller | Made in Taiwan |
After-Sale Service Provided | Engineers Available to Service Machinery Overseas |
Material | HDPE,LDPE |
Transport Package | Wrapping Film Packing or Packed in Wooden Case |
Specification | CE, ISO9001: 2008, SGS, TUV |
Trademark | SILSTAR |
Origin | Jiangyin City Jiangsu Province |
HS Code | 84778000 |
Product Description
Product Description
Silstar's automatic drawstring bag making machine are using the newly designed and stable rolling system which can release you from the manual rolling mode, improve the production efficiency remarkably. Automatic draw string bag making machine is able to produce HDPE,LDPE draw string/draw tape bags. Due to the photocell being equipped on the machine, it makes the machine can easily handle both printed bags and white bags. By increasing of raw material cost these years, many plastic bag makers are adding recycle material or Caco3 into granules, which causes the film to be harder to seal. While Silstar's seal knife is could seal the film which is mixed with recycled material and CaCO3 firmly.Product Parameters
Items | GBBCR-800 | GBBCR-1000 | GBBCR-1200 |
Lines | One deck, one line | One deck, one line | One deck, one line |
Bag width | 300-600mm | 300-850mm | 500-1000mm |
Bag length | 120-700mm | 120-900mm | 120-1000mm |
Bag thickness | 0.006-0.035mm | 0.006-0.035mm | 0.006-0.035mm |
Output one | 100-120pcs/min | 100-120pcs/min | 100-120pcs/min |
Total Power | 12kw | 13kw | 14kw |
Model name | Rolling draw tape bag making machine |
Final product | Draw tape bag |
Application | Draw tape bag,printed or unprinted draw tape garbage bag |
Material | HDPE,LDPE,Recycled material,CACO3 added |
Bag length | 120-1000mm |
Bag width | 50-1000mm |
Output | 50-120pcs/min |
Unwinder way | Motor driver control |
Servo | Taiwan TECO *2 |
Inverter | Taiwan TECO |
Air cylinder | Taiwan AirTAC |
Delivery time | 30-60 days |
Warranty | 1 year |
Technical Assistance | Engineers are avilable service machine oversea |
Optional device | Automatic paper core change device |
Detailed Photos
Main products:
Company Profile
Silstar machinery founded in 1997, covers an area of 32,000 m2, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.SILSTAR Workshop Pictures:
Certifications
Packaging & Shipping
Exhibition
FAQ
1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |